Flagship Way/ Pier 4 sinkhole

July 24, 2020

Flagship Way/ Pier 4 sinkhole
Sinkhole repairs by the entrance to Pier 4 will begin the week beginning July 20. The fencing for the work area will entail closing a small portion of the Harborwalk near the entrance to the pier. Signage will be installed to direct pedestrians through the bench area by the Pop Warren garden.The duration of the construction will be approximately 2 months.
Any questions feel free to reach out to Dick Mulligan.